Finding the gaps inside the Ring
Berlin needs homes, and the inner city still has holes: car parks, wasteland, lots nobody built on after the war or after the Wall. We went through every parcel inside the S-Bahn Ring to find them, and to estimate how many apartments they could hold.
Scroll to follow the search, step by step.
Step 1
Draw the line
The S-Bahn Ring encircles the dense core of Berlin. Its outline happens to be an official dataset: Berlin's low-emission zone (Umweltzone) is exactly the area inside the Ring.
87 km²
inside the Ring, about a tenth of Berlin
Step 2
Every parcel
The land register (ALKIS) divides the city into parcels. Each dot on the map is one of them: courtyards, streets, river banks, cemeteries, schools, office blocks.
0
parcels inside the Ring
Step 3
Remove what's built
We overlaid every registered building footprint. A parcel stays in the search only if buildings cover less than 10% of it.
0
parcels nearly empty
Built parcels fade out. What remains is still mostly parks, streets and water.
Step 4
Keep what's meant to stay open
Parks, playgrounds, cemeteries, allotment gardens, schools, water, railways and streets are not building land. We removed every parcel that overlaps them, using Berlin's green-space register and OpenStreetMap.
0
parcels left
Step 5
Stitch parcels into sites
Big lots are often split into many thin parcels. Luisenblock Ost, between Schiffbauerdamm and the Stadtbahn viaduct, is 19 parcels and about 3.3 hectares of gravel and parking. Each parcel alone looked like a street strip, so our first pass missed it entirely.
Now neighbouring empty parcels are merged into one site before we judge size and shape.
0
candidate sites
Step 6
Look at every one
Registers lag reality. New buildings take years to appear in the land register, and a parcel listed as empty may be a courtyard garden. So each site gets checked against the 2024 aerial photo.
0
sites checked so far
Step 7
What could be built
Floors follow the median height of the buildings next door, the way Berlin's planning law asks new buildings to fit in. Then it depends on how much you assume.
0
apartments
Then it kept growing
Everything above was the first morning. Over the next three days the map took in the whole city, the rooftops, the plans already under way, bigger open areas, and what the district parliaments have said about each site. Here is the diary, in the order it happened.
Tuesday 27 October, 11:53
The idea
One question to start with: looking down from above, which plots inside the Ring are still empty? By lunch there were parcels, footprints, an aerial photo for every site and a first count of apartments.
Tuesday, 12:35
Beyond the Ring
Forty minutes in came the obvious next question: why stop at the Ring? The same funnel ran over every parcel in Berlin. That gave too many sites to check by eye, so Claude Haiku looked at each aerial photo and labelled what it saw.
0
sites across the city, each checked from the air
Tuesday, 15:07
Up on the roofs
Empty land is only part of the answer. Berlin's 3D city model gives every building its height and roof shape. With it we found street-front houses that are lower than the neighbour they share a wall with, and raised them to the shared eaves line. We also found single-storey supermarkets that could carry flats.
0
extra floors on 12,633 buildings, plus homes above 516 supermarkets
Tuesday, 18:16
Already in the works
A link to the Tegel project raised a fair point: some of these sites are already being planned. We added the Senate's housing plan (StEP Wohnen 2040) and every development plan (Bebauungsplan) in progress, and tagged each site that lies inside one.
0
plans: 238 housing sites, 24 new city districts, 1,194 development plans
Tuesday, 18:57
Bigger areas worth a look
Tegel's runway is becoming a neighbourhood. Are there other places like it that aren't parks? From the 2020 land-use map we took brownfields, farmland, sparse industry, airfields and military land. Nature reserves and anything already planned were left out.
0
areas of 25 hectares or more, 2,919 hectares together
Wednesday 28 October
What the district parliaments said
Each district parliament (BVV) publishes its papers through an open interface called OParl. We went through the archives of 11 districts, about 120,000 papers. We opened only the PDFs whose titles name a site's street or plan number, and Claude Haiku confirmed each match and summarised it in one line. Spandau has no such interface.
0
papers about 2,012 sites, each one blinking on the map
Thursday 29 October
One site, fourteen years of paper
Andreasstraße 69, near Ostbahnhof: two hectares, still empty. Since 2010 the district has started a plan for it, frozen it, reserved it for a school and finally dropped the plan. Every site on the map now carries its record like this, and each paper links to the original in the district's archive.
Where the data comes from
Open data, all of it
- Land parcels and buildings
- ALKIS Flurstücke and Gebäude, Geoportal Berlin WFS, dl-de/zero-2.0
- Aerial photos
- TrueDOP 2024 true-orthophotos, Geoportal Berlin WMS, dl-de/zero-2.0
- Parks and playgrounds
- Grünanlagen and Spielplätze, Geoportal Berlin WFS, dl-de/zero-2.0
- The Ring
- Umweltzone, Geoportal Berlin WFS, dl-de/zero-2.0
- Building heights and roofs
- LoD2 3D city model, Geoportal Berlin, dl-de/zero-2.0
- Plans and land use
- StEP Wohnen 2040, Bebauungspläne, Umweltatlas reale Nutzung 2020, Geoportal Berlin WFS, dl-de/zero-2.0
- District parliament papers
- OParl interfaces of 11 district parliaments, CC BY 3.0 DE
- Streets, rail, water, schools, supermarkets
- © OpenStreetMap contributors, ODbL
This is a screen, not a planning verdict. Ownership, soil contamination and the details of each plan still need checking site by site.
For comparison: the Senate's own inventory (WoFIS) only lists sites for 50 or more homes, and a gap register by the FDP and CBRE claims room for about 162,000 homes citywide.
Explore the map