Empty building sites in Berlin, found in the land register and checked against 2024 aerial photos. How many homes could go there?
Why include bigger areas?
Gaps and rooftops alone won't house Berlin. The city's big new districts, like the one on the former Tegel airport, sit on land that was never a gap: old airfields, rail yards, barracks, brownfields and farmland. These 57 areas of 25 ha or more are that kind of land, minus nature reserves, protected landscapes, compensation areas and the districts the city already plans.
They count at 50 homes per hectare across the whole area, a moderate new neighbourhood with its own streets, schools and parks. Much of it is industrial land the city wants to keep for business, so treat this as the upper edge of what's possible, not a plan. Off by default.
Adjust assumptions
Buildings
Share of the site the building covers (GRZ). Berlin block edges often reach 0.6.
Gaps match the party walls on either side; free-standing sites may go up to 1.5× their surroundings within the 0.4 H setback.
Gross, incl. stairs and walls. 80% counts as usable.
Leave out
What the empty sites look like
How this was made
- All land parcels in Berlin from the ALKIS land register (42,000 inside the Umweltzone, which is exactly the S-Bahn Ring).
- Keep parcels with little on them according to the register's building footprints.
- Drop parcels overlapping parks, playgrounds, cemeteries, allotments, schools, water or rail, or crossed by a street.
- Merge neighbouring empty parcels into sites, so a lot split into many strips counts as one.
- Sort sites into tiers: gaps between buildings up to 1.5 ha (conservative), up to 5 ha with a neighbour (middle), up to 20 ha (everything).
- Check every site on the 2024 true-orthophoto by eye: vacant, parking, construction site, already built, green space, open space between slab blocks, public space or other.
- Apartments = area × ground coverage × floors × 0.8 ÷ floor area per apartment.
- Extra floors: residential buildings lower than the building they share a wall with are raised to its eaves line (max +2; mansard roofs already hold a floor). Free-standing flat roofs of 3–6 floors get +1. Roof shapes from the LoD2 3D city model.
- Already planned: a site counts as planned when a StEP Wohnen 2040 housing site lies within 50 m of it or a new city district covers 30% of it. A development plan (B-Plan) in progress is shown separately: many have been open for decades.
- Bigger areas worth a look: blocks of the 2020 land-use map that are brownfield, farmland, grassland, sparse industry, airfield or military land, minus nature protection, compensation areas and the planned new districts; touching blocks merged, 25 ha or more. A screen only: much of it is industrial land the city wants to keep, and it counts at 50 homes per hectare, and only when switched on.
- Supermarkets: single-storey stores from OpenStreetMap matched to the land register, with homes on top up to the surrounding height; Middle and Everything also build over their surface car parks.
A rough screen, not a planning verdict. Ownership, adopted development plans, structural capacity and soil contamination are not checked; heritage, flood zones, noise and the land-use plan are, at the site's centre point. Data: Geoportal Berlin (dl-de/zero-2.0: ALKIS, StEP Wohnen 2040, development plans, land-use map 2020, protected areas, LoD2 3D model, orthophotos 2024, land-use plan, land values 2025, flood zones, strategic noise map 2022), Denkmalkarte Berlin, Landesdenkmalamt Berlin (dl-de/by-2.0), district parliament papers via the OParl interfaces of 11 districts (CC BY 3.0 DE; Spandau has none), summarised by Claude Haiku, © OpenStreetMap contributors (ODbL), OpenFreeMap.